· slab
How it looks on the PDF the client gets. Estimora sets this when it builds the quote — switch it any time.
One price per part of the job (excavation, concrete, finishing…).
💡 Pricing coach
This quote: $15.20/sq ftMark a few of these jobs won or lost (on the quote's Pipeline) and I'll learn the price range where you actually win.
Talk to Estimora about this quote
Ask why it's priced this way, or tell it what's off — it re-prices from your cost database.
Edit this quotetakeoff · line items · margin · scope▾
Missing info — confirm with the client
- Poly vapour barrier under slab required? (typical for garage slabs)
- Saw-cut control joints required?
- Crew size not specified
- Duration not specified — depends on crew size
Assumptions made
- No granular base specified — base_material and base_depth_in set to null; pricing engine will not apply base material cost
- Wire mesh specified by contractor, overriding slab default of rebar_10m_16oc
- Excavation marked false as no base prep is required; demo of existing slab assumed to be at grade
Line items
| Category | Description | Qty | Unit | Unit cost ($) | Cost | Price | ||
|---|---|---|---|---|---|---|---|---|
| $1,880.00 | $2,506.67 | |||||||
| $672.00 | $896.00 | |||||||
| $184.80 | $246.40 | |||||||
| $52.80 | $70.40 | |||||||
| $320.00 | $426.67 | |||||||
| $320.00 | $426.67 | |||||||
| $640.00 | $853.33 | |||||||
| $900.00 | $1,200.00 | |||||||
| $500.00 | $666.67 | |||||||
| $90.00 | $120.00 | |||||||
| $180.00 | $240.00 | |||||||
| $1,100.00 | $1,466.66 | |||||||
What did you forget?
Checks the description against your line items for missed costs.
Tip: this is the "second set of eyes" — run it before every send. It catches the stuff that eats margins: missing disposal, no compaction, unpriced access problems.
Scope of work (goes on the client PDF)
Client quote (what the homeowner sees on the PDF)
Your line items get grouped into a few plain deliverables — no “excavator 2 days”. Your costs and margin stay private; the prices here are summed from your line items and always match the total.
Click Draft from costs to group your line items into client-friendly deliverables, then rename, merge, or reorder them before you send the PDF. Prefer one line? You can still pick “Lump sum” when you export.
Other PDF formats
Grouped client deliverables, items + total, and the full set — for when you want something other than the three above.
Estimora calculated these numbers from your cost database, but you own the quote — review quantities and pricing before it goes to the client.